TRENDING:

Dynamic Details and BKM’s
Rosendin Reader Program
In-Wall Rough – Best Known Methods
Construction DEI Talks Podcast
QA/QC Newsletter – Spring 2022
Showcase Your Field Ingenuity on Youtube!
Explore your Top 5 Strengths with Inpowering People
Innovating Conduit Trenches in the Desert
Virtual Construction 101
QA/CX Newsletter – Winter 2022
PlanGrid field training handout
QA/CX Newsletter – Winter 2020
Code Corner – 2020 NEC Update 110.12 (C): Cables ...
Code Corner – NEC 250.52 (A)(2): Metal In-ground ...
Rosendin University
  • Home
  • Trim Tab
  • Code
  • BKM/Photo
  • Video

Select Page

Code Corner 2020 NEC Update 240.6(C): Restrict Access to Trip Breakers

Oct 26, 2022 | Code | 0

Adds modern methods of restricting access to adjustable trip circuit breakers The Code: Section 240.6(C) Restricted Access Adjustable-Trip Circuit Breakers A circuit breaker(s) that has restricted access to the adjustable means...

Read More

Code Corner 2020 NEC Update 230.71 and 230.85: Disconnect Regulations

Oct 25, 2022 | Code | 0

New sections specify the location and number of disconnects for a circuit The Code: Section 230.71 Each service shall have only one disconnecting means unless the requirements of 230.71 (B) are met(B) Two to Six Service...

Read More

QA/QC Newsletter – Spring 2022

May 25, 2022 | Uncategorized | 0

Below is the QA/QC Newsletter for Spring of 2022! If you have any questions, please contact Dee Farmer at [email protected] QA_Cx-Newsletter-Spring-2022Download QA/QC Certification Course Videos [email protected] Job...

Read More

Code Corner 2020 NEC Update 215.9 & 10: GFCI Protection for Feeders and Equipment

May 18, 2022 | Code | 0

GFCI limitations are removed for both temporary and permanent feeders. Definitions GCFI: Stands for Ground-Fault Circuit-Interrupter. When there is an unbalanced current as a result of one of the conductors coming into contact...

Read More

Code Corner 2020 NEC Update 210.65: Receptacles in Meeting Rooms

May 16, 2022 | Code | 0

The existence of meeting rooms with more diverse layouts require updated standards Definitions Text The Code: Section 210.65 Meeting Rooms (A) General. Each meeting room of not more than 93 m^2 (1000 ft^2) in other dwelling...

Read More
  • 1
  • 2
  • 3
  • …
  • 17

Designed by Elegant Themes | Powered by WordPress